EN

49 1/2” 500psi Diverter

Diverter system is a key component of offshore drilling mostly,and it always services the surface layer drlling before BOP. The diverter assembly is the uppermost component of the riser system.It is not used to shut or seal the well completely, but to either direct the returning drill fluid or control the blowout and surface layer gas. When encountering the gas, the diverter can close off around drillpipe or casing,and open the special direction vent line on board at the same time. With the platform manifold,the gas will be guided and choked at special point.

 

Diverter system must be equipped with hydraulic control system to use. With the different size of packers, it is able to seal various shapes and sizes of drilling tools including Kelly, drill pipes, tool joints, drill collar, etc.

Specifications

> Used on the majority of floating rigs.

> Complete open-hole shutoff with 20" through-bore.

> Switch on or off quickly.

> Housing accommodates large diameter riser buoyancy modules.

> High capacity systems available for supporting the Riser String from Diverter Housing in emergency hang-off situations.

Product Picture

Address: Room 3707, Building 1, No. 35 Shishan Road, High tech Zone, Suzhou City, Jiangsu Province, China

Copyright © 2024 Suzhou NEFT Energy Technology Service Co.,Ltd. All right reserved

ICP.No: 苏ICP备2024098698号-1