
260 gas turbine unit
The 260 gas turbine unit adopts intelligent integration and digital control, with high power, small size, and fast power response, suitable for various gas power generation, industrial power stations, distributed energy, industrial exhaust utilization, oil and gas platform power, compressor power, ship power, solar thermal energy storage and other special industries for power guarantee.
|
Product series |
260 gas turbine unit |
|
Type |
Four stroke, exhaust gas turbocharging, two-stage intercooling, multi-point injection, air-fuel ratio closed-loop control |
|
Number and arrangement of cylinders |
12V、16V |
|
Cylinder diameter x stroke mm |
260mm×320 |
|
Rated speed r/min |
900、1000 |
|
Power range |
2700-4000 kW |
|
Frequency Hz |
50/60 |
|
Voltage |
400V/480V/660V/6300V/10500V/13800V |
|
Minimum gas consumption |
≤8100kJ/kW·h |
|
Emission standard |
Meet the requirements of IMO II and China's second maritime country |
Product spectrum:
|
Product series |
Model |
Electric power kW |
Speed rpm/Hz |
External dimensions |
Emission level |
|
260 gas turbine unit |
2700GF |
2700 |
900/60 |
8330×2900×3600 |
IMOⅡ EPA TierⅡ |
|
3000GF |
3000 |
1000/50 |
|||
|
3600GF |
3600 |
900/60 |
9430×2900×3800 |
||
|
4000GF |
4000 |
1000/50 |
Economic and Environmental Protection
High performance control system, high-energy multi-point injection, greatly reducing gas consumption, electrical efficiency ≥ 43%;
Accurate air-fuel ratio control, maximum reduction of pollutant emissions, meeting high environmental standards;
Suitable for on-site load conditions
Fully digital human-machine interaction, transient response to changes in operating conditions, and real-time fulfillment of load variation requirements;
Intelligent control, meeting the requirements of data information transmission, multi machine parallel control, simple and fast operation;
Safe, reliable, and continuous operation
The material selection and process of the components are synchronized with international standards, making them easy to maintain and more durable and reliable, with a major overhaul period of 35000 hours;
A comprehensive security protection system, real-time monitoring of operational status, ensuring safe and long-term operation;
High performance electrical components ensure a long lifespan;
Remote operation monitoring
Realize remote monitoring and control, provide comprehensive backend management and operation, as well as overall construction and management of the power station.

EN


